A facility wants to validate that its OT incident response plan works without risking production. Which low-risk activity directly tests decision-making and roles?
- A.Detonating live ransomware on a spare PLC
- B.Disabling the safety instrumented system to see who notices
- C.Disconnecting the historian during peak production
- D.Running a tabletop exercise based on a realistic OT scenario
Why D is correct
A tabletop exercise walks the team through a discussion-based scenario, testing roles, communication paths, and decisions without touching live systems. It is a core preparation activity precisely because it avoids operational risk.
Know someone studying for OT Security Fundamentals? Send them this one.